| NIT No. |
Description |
Submission Time/Date |
Opening Time/Date |
Corrigendum
(if any)
|
281 |
Tender for the sale of Un-serviceable Scrap material |
12.00 hrs 31.01.2012 |
12.15 hrs 31.01.2012 |
N |
280 |
Tender for the contract of Haulage of salt including loading transportation, unloading and heaping operations from Salt works to Main stores of Hindustan Salts Limited, Kharaghoda for the year 2011-2012 |
12.00 hrs 28.01.2012 |
12.15 hrs 28.01.2012 |
N |
279 |
Tender for supply of 3 Nos. of new M.S. Water Tanker each capacity 10.50 Cubic Meter.± 2% |
15.00 hrs 09.01.2012 |
15.30 hrs 09.01.2012 |
N |
278 |
Tender for the contract of Production and Haulage of salt including loading transportation, unloading and heaping operations from Salt works to Main stores of Hindustan Salts Limited, Kharaghoda for the year 2011-2012 |
12.00 hrs 31.12.2011 |
12.15 hrs 31.12.201 |
N |
277 |
Renovation of A.C. Sheet roofing of P. S. Plant at Sales circle during 2011-2012 |
15.00 hrs 19.12.2011 |
15.30 hrs 19.12.201 |
N |
276 |
Re-construction of Pan Pattries at Nawa Kyar During 2011-2012 |
15.00 hrs 19.12.2011 |
15.30 hrs 19.12.201 |
N |
275 |
Digging of Hard Strata in R.C.C. Surface wells at Jhapog Kyar during 2011-12 |
15.00 hrs 19.12.2011 |
15.30 hrs 19.12.201 |
N |
274 |
Digging of Hard Strata in R.C.C. Surface wells at Gudha Kyar during 2011-2012 |
15.00 hrs 19.12.2011 |
15.30 hrs 19.12.201 |
N |
273 |
Digging and Development of Old Bore well No. (49) for Model Salt Plant at Nawa Lake Area during 2011-2012 |
15.00 hrs 19.12.2011 |
15.30 hrs 19.12.201 |
N |
272 |
Construction of Watch Towers at Lake Area during 2011-2012. |
15.00 hrs 19.12.2011 |
15.30 hrs 19.12.2011 |
N |
271 |
Construction of A.C. Sheet Shed at P. S. Plant, Sambhar Lake during 2011-2012 |
15.00 hrs 19.12.2011 |
15.30 hrs 19.12.2011 |
N |
270 |
Appointment of Virgin Bittern Suppliers for arranging supply of 2,00,000 M3 ( + 10%) Virgin Bitterns of minimum 290 Be Density and 3.4 GPL Bromine, on actual receipt of GPL Bromine contents basis, at the Company’s Reservoirs near Bromine Plant at Kharaghoda |
15.00 hrs 28.12.2011 |
15.30 hrs 28.12.2011 |
N |
269 |
Supply, installation and commissioning of Multi-fuel Boilers and Dryer with preheating system |
15.00 hrs 05.12.2011 |
15.30 hrs 05.12.2011 |
Y |
268 |
Salwood Sleepers for MG/NG Rail track |
14.00 hrs 19.12.2011 |
14.30 hrs 19.12.2011 |
N |
267 |
Supply of Polyester Roll/ Pouches for packing of 1 Kg salt |
14.00 hrs 16.12.2011 |
14.30 hrs 16.12.2011 |
N |
266 |
Interior work(work stations) at Corporate Office, Jaipur |
14.00 hrs 12.12.2011 |
14.30 hrs 12.12.2011 |
N |
265 |
Furnace Oil of density 0.96 to 0.98 |
14.00 hrs 21.12.2011 |
14.30 hrs 21.12.2011 |
N |
264 |
Washed Crushed Iodised salt to be packed in 1 Kg. transparent poly bags with master pack of 25 packets in new HDPE bags, stacking and loading on to the railway wagon and unloading for further supply /transportation to the respective godowns of CSCSC in Chhattisgarh state on F.O.R Chhattisgarh godowns delivery basis |
12.00 hrs 03.12.2011 |
12.30 hrs 03.12.2011 |
N |
263 |
Supply of Batch Printer Machine |
15.00 hrs 05.12.2011 |
15.30 hrs 05.12.2011 |
Y |
262 |
Consultant for preparation of Detailed Feasibility & Viability Report for exploring the possibility to manufacture the by products of Bromine at Kharaghoda |
15.00 hrs 05.12.2011 |
15.30 hrs 05.12.2011 |
Y |
261 |
Supply of one no. of 62.5 KVA Silent D.G. Set |
15.00 hrs 05.12.2011 |
15.30 hrs 05.12.2011 |
Y |
260 |
Supply of one no. of 40 KVA Silent D.G. Set |
15.00 hrs 05.12.2011 |
15.30 hrs 05.12.2011 |
Y |
259 |
Transportation of salt from Sambhar Lake/Gudha/ Nawa(Rajasthan) to various destinations in India |
15.00 hrs 26.11.2011 |
15.30 hrs 26.11.2011 |
N |
258 |
Supply of virgin Bitterns of 2,50,000 cum + 10% (with 29 Be density and containing minimum 3.4 gpl. Bromine) at the Company’s Reservoirs near Bromine Plant at Kharaghoda |
15.00 hrs 17.11.2011 |
15.30 hrs 17.11.2011 |
N |
257 |
Supply of 42000 MT +/- 25% of crushed and Iodised Salt, Arranging packing in 1 Kg. in LDPE bags with master pack of 20 packets in HDPE bags, stacking and loading on to truck, Supply of LDPE/HDPE bags, Transportation of salt in Gujarat state at the given stations including unloading & stacking on godowns on door delivery basis
|
14.00 hrs 05.11.2011 |
15.00 hrs 05.11.2011 |
N |
256 |
Implementation of ERP
|
17.30 hrs 17.11.2011 |
11.00 hrs 18.11.2011 |
N |
255 |
Consultancy work for permission from Central Ground Water Board
|
15.00 hrs 03.11.2011 |
15.30 hrs 03.11.2011 |
N |
254 |
Works regards to Gudha Salt Refinery Related Work
|
14.30 hrs 12.10.2011 |
15.00 hrs 12.10.2011 |
N |
253 |
Works regards to DESPATCH OF SALT BY RAIL/ROAD
|
14.30 hrs 12.10.2011 |
15.00 hrs 12.10.2011 |
N |
252 |
Works regards to EXTRACTION & STORAGE OF SALT
|
14.30 hrs 12.10.2011 |
15.00 hrs 12.10.2011 |
N |
251 |
Works Related to Process Salt Plant |
14.30 hrs 12.10.2011 |
15.00 hrs 12.10.2011 |
N |
250 |
Preparation of work Stations at Corporate Office
|
15.00 hrs 29.09.2011 |
15.30 hrs 29.09.2011 |
N |
249 |
Cutting of salt, iodisation of salt from iodisation plant and filling of salt into 50 kg. Hdpe bags weighment, stiching, stacking of bags and loading into the railway wagons from railway sidings at sambhar lake
Railway station
|
14.30 hrs 16.09.2011 |
15.00 hrs 16.09.2011 |
N |
248 |
Supply of HDPE bags |
14.00 hrs 29.09.2011 |
14.30 hrs 29.09.2011 |
N |
247 |
Supply of HDPE bags |
15.30 hrs 14.06.2011 |
15.30 hrs 14.06.2011 |
N |
246 |
EXTRACTION & STORAGE OF SALT |
15.30 hrs 14.06.2011 |
15.30 hrs 14.06.2011 |
N |
245 |
Transportation of Refined Iodised Salt in HDPE 50 Kg. Bags from Gudha Salt Refinery to Gudha Railway Station Siding and Loading into Railway Wagons |
15.30 hrs 14.06.2011 |
15.30 hrs 14.06.2011 |
N |
244 |
ASupply of Potassium Iodate |
15.00 hrs 14.06.2011 |
15.30 hrs 14.06.2011 |
N |
243 |
Appointment of Distributor for arranging LRT work |
15.30 hrs 14.06.2011 |
15.30 hrs 14.06.2011 |
N |
242 |
Transportation of Liquid Chlorine tonners |
15.00 hrs 17.06.2011 |
15.30 hrs 17.06.2011 |
N |
241 |
Implementation of ERP |
17.30 hrs 31.05.2011 |
11.00 hrs 01.06.2011 |
N |
240 |
Supply of Polyester Roll/ Pouches |
15.00 hrs 21.03.2011 |
15.30 hrs 21.03.2011 |
N |
239 |
Storage of Salt from Main Line Pan Works (From Plate Form and Pan Patri) |
14.30 hrs 28.01.2011 |
15.00 hrs 28.01.2011 |
N |
238 |
Supply of virgin Bitterns of 2,50,000 cum + 10% (with 29 Be density and containing minimum 3.4 gpl. Bromine) at the Company’s Reservoirs near Bromine Plant at Kharaghoda |
15.00 hrs 24.01.2011 |
15.30 hrs 24.01.2011 |
|
237 |
Supply of Polyster Pouch Roll and 1 Kg. Pouch |
15.00 hrs 23.12.2010 |
15.30 hrs 23.12.2010 |
N |
236 |
Supply of H.D.P.E. Bags |
15.00 hrs 23.12.2010 |
15.30 hrs 23.12.2010 |
N |
235 |
Construction of one room set and Construction of Boundary wall at Sitapura Industrial area Jaipur
|
15.00 hrs 30.11.2010 |
15.30 hrs 30.11.2010 |
N |
234 |
Re-construction of road from Railway level crossing to Central store No. (8) at Sambhar Lake
|
15.00 hrs 15.11.2010 |
15.30 hrs 15.11.2010 |
Y |
233 |
Experienced Consultants in two bids (Technical bid & Price bid) separately for Technical Evaluation / Compatibility of all plant & Machineries and evaluation of quality of stagewise product and civil works at Gudha Salt Refinery at Sambhar Lake
|
15.00 hrs 27.10.2010 |
15.30 hrs 27.10.2010 |
Y |
232 |
Supply of crushed and Iodized Salt( As per PFA Act,and as per ISI STANDARD) packed in 1 Kg LDPE with subsequent packing in 50 Kg HDPE bags on FOR various destinations in Madhya Pradesh |
15.00 hrs 20.09.2010 |
- |
N |
231 |
Supply installation & commissioning of Laboratory Equipments & Apparatus for Gudha Salt Refinery. |
15.00 hrs 07.09.2010 |
15.30 hrs 07.09.2010 |
N |
230 |
Supply of Iodized Salt ( ISI Marked) packed in 1 Kg Polyester laminated bags with subsequent packing in 50 Kg HDPE bags on delivered basis at various block level godowns around Udaipur |
15.00 hrs 13.09.2010 |
- |
Y |
229 |
Supply of crushed and Iodized Salt( As per PFA Act,and ISI MARKED) packed in 1 Kg LDPE with subsequent packing in 50 Kg HDPE bags on FOR various destinations in Madhya Pradesh |
15.00 hrs 15.09.2010 |
- |
Y |
228 |
Supply of Iodized Salt ( ISI Marked) packed in 1 Kg Polyester laminated bags with subsequent packing in 50 Kg HDPE bags on delivered basis at various block level godowns around Udaipur |
15.00 hrs 02.07.2010 |
- |
N |
227 |
Supply of crushed and Iodized Salt( As per PFA Act,and ISI MARKED) packed in 1 Kg LDPE with subsequent packing in 50 Kg HDPE bags on FOR various destinations in Madhya Pradesh
|
15.00 hrs 08.07.2010 |
- |
N |
226 |
Supply of Dog Spikes, M.S. Fish Plate, M.S. Fish Bolts and Nut to Sambhar Salts Limited at Sambhar Lake |
15.00 hrs 25.06.2010 |
15.30 hrs 25.06.2010 |
N |
225 |
Supply of Laboratory Equipments, and accessories for our Salt Refinery, Gudha Dist. Nagour. |
15.00 hrs 08.06.2010 |
15.30 hrs 08.06.2010 |
Y |
224 |
Transportation of salt from Gudha & Sambhar Lake(Raj) to various destination in India. |
15.30 hrs 05.06.2010 |
15.30 hrs 05.06.2010 |
N |
223 |
Supply of Polyester Roll/ Pouches for packing of 1 Kg salt |
11.30 hrs 05.06.2010 |
11.30 hrs 05.06.2010 |
N |
222 |
Supply of Laminated & un-laminated HDPE bags of 50 Kgs/25 Kgs capacity |
12.15 hrs 05.06.2010 |
12.15 hrs 05.06.2010 |
N |
221 |
sale of Scrap Rails (70 MT) |
12.00 hrs 23.03.2010 |
12.15 hrs 23.03.2010 |
N |
220 |
Supply of Iodised Salt (ISI marked) packed in 1 Kg. Polyester laminated bags with master pack of 50 packets in HDPE bags to TAD udaipur |
15.00 hrs 04.03.2010 |
15.30 hrs 04.03.2010 |
N |
219 |
Supply and installation of two Volumetric Automatic Form Fill and Seal Machines at Salt Refinery |
15.00 hrs 18.02.2010 |
15.30 hrs 18.02.2010 |
N |
218 |
One No. 315 KVA Distribution Transformer |
15.00 hrs 27.01.2010 |
15.30 hrs 27.01.2010 |
N |
217 |
Fabrication of One number S.S. Impeller dully dynamic balancing |
15.00 hrs 27.01.2010 |
15.30 hrs 27.01.2010 |
N |
216 |
Supply, Installation & Commissioning of (1) One No. Fully Electronic Weigh Bridge Capacity 80 MT (Pit Mounted) |
15.00 hrs 27.01.2010 |
15.30 hrs 27.01.2010 |
N |
215 |
supply of 5 Nos. of new M.S. Water Tanker each capacity 10.50 Cubic Meter.± 2% |
15.00 hrs 20.01.2010 |
15.30 hrs 20.01.2010 |
N |
214 |
sale of Scrap Rails (300 MT) and non ferrous material |
12.00 hrs 19.01.2010 |
- |
N |
213 |
Construction of shed for preparation of Iodised salt at M.S.S. Platform, |
15.00 hrs 11.12.2009 |
15.30 hrs 11.12.2009 |
N |
212 |
Extraction & Storage of salt from Deodani Pan Works & Gudha Kyar |
14.30 hrs 24.11.2009 |
15.30 hrs 24.11.2009 |
N |
211 |
Sale of Scrap Rails (300 MT) and non ferrous material |
12.00 hrs 05.12.2009 |
- |
N |
210 |
Various works in the Sambhar Lake area |
15.00 hrs 21.10.2009 |
15.30 hrs 21.10.2009 |
N |
209 |
Supply of Virgin Bitterns of 2,50,000 cum.± 10% (with 29 Be density and containing minimum 3.4 GPL Bromine |
15.00 hrs 26.10.2009 |
15.30 hrs 26.10.2009 |
N |
208 |
Allotment of land for Salt Production on licence fee basis |
15.00 hrs 30.09.2009 |
15.30 hrs 30.09.2009 |
Y |